GUIDE

How to Compare Solar Quotes in NZ: What a Good Quote Includes

Solar quotes can look similar but include different equipment, warranties, installation costs and savings estimates. Comparing them properly means checking the full offer, not just the price.

This guide covers what a complete NZ quote should include, the minimum warranties EECA suggests, the numbers to question and the red flags to watch for.

Last reviewed: November 2026

General information only. Rules and products change, so check details with your installer before you sign.

Homeowner comparing two solar quotes at the kitchen table

The Key Facts

Use these to check any solar quote, whoever it’s from.

Itemised, not a single price

A complete quote lists the panels, inverter, racking, cabling, surge protection, inspections and meter costs (EECA).

5-year workmanship minimum

EECA suggests at least 5 years on workmanship and 10 years on panels (EECA).

Savings rest on assumptions

In Consumer NZ’s test, one hidden setting cut the payback on the same quote from nearly 15 years to 8.8 (Consumer NZ).

Usually no building consent

Since 23 October 2025, rooftop arrays under 40 m² in wind zones up to high are generally exempt, subject to the exemption conditions (building.govt.nz).

A safety certificate at the end

A registered electrical inspector checks the system and issues an Electrical Safety Certificate if it passes (EECA).

Usually 4 weeks or less

From accepting a quote to install is usually 4 weeks or less, longer for complex jobs (EECA).

What Should a Solar Quote Include? A Checklist for Comparing Quotes

QUICK ANSWER

A good solar quote should show exactly what you’re getting, what it costs and what’s included in the installation. It should identify the main equipment, any extra work, warranties and how the estimated savings were calculated.

Solar quote checklist

ItemWhat to look for
PanelsBrand, model, number of panels and total system size in kW
InverterBrand, model and type (string, micro or hybrid). If it isn’t named, ask for it in writing
Racking and roof workPurpose-designed racking, roof penetrations, resealing and any roof repairs
Electrical partsCabling, surge protection and switchboard work
ScaffoldingWhether it’s needed and who supplies it
Network applicationThe distributed generation application to your lines company
MeterImport/export meter or meter reconfiguration, and its cost
Inspections and certificatesElectrical inspection and certificates included in the price
BatteryOnly if you want one: brand, size and install cost
WarrantiesSeparate terms for panels, inverter, battery and workmanship
Savings assumptionsSelf-consumption rate, export price, power use and shading
Payment termsDeposit, balance due dates and GST

Sources: EECA quotes and install; EECA residential solar checklist.

Ask what isn’t included, too. EECA’s checklist suggests a quote should state any network upgrades and any separate wiring needed to keep essential circuits, such as medical equipment, running during a power cut (EECA).

What Warranties Should a Solar Quote Include?

Every part of a solar system has its own warranty, plus a separate workmanship warranty from the installer. EECA suggests these minimums.

EECA’s suggested minimum warranties

PartMinimum warranty
Workmanship (the installation)5 years
Panels (product warranty)10 years
String inverter5 years
Microinverters10 years
Lithium-ion battery10 years

Source: EECA. Some panels also have a separate performance warranty. Check what each warranty covers, who provides it and how you make a claim.

Check who you claim from. The installer usually backs workmanship, while the manufacturer backs the product. Under the Consumer Guarantees Act, products must also be of acceptable quality and services done with reasonable care and skill, whatever the warranty says (Consumer Protection).

How to Check the Savings Figures in a Solar Quote

Savings and payback figures come from software, and they’re only as good as the numbers put in. When Consumer NZ tested popular quoting software, the same house at the same price showed a payback of nearly 15 years with a realistic setting, and 8.8 years when it assumed the household used all its own solar power. That setting didn’t appear on the final quote (Consumer NZ).

Ask your installer these four questions.

What Self-Consumption Rate Did You Use?

This is the share of your solar power you use at home rather than export. How much you use at home depends on when you use electricity. If your home uses little power during daylight hours, more of your solar generation may be exported. Ask for evidence of the rate used.

What Export Price Did You Assume?

Power you send to the grid earns less than power you buy. Check the buy-back rate in the quote matches what your retailer pays.

What Power Use Did You Base It On?

Give the installer your last 12 months of power bills so the system is sized on your real use, not an average.

How Did You Allow for Shading?

Trees, chimneys and nearby buildings cut output. A site visit is the best way to check.

You can cross-check any quote with EECA’s free solar power calculator. EECA says to treat its results as a guide.

Want a quote you can check against this list?

Answer a few questions and we’ll pass your enquiry to one installer from our network.

What Happens After You Accept a Solar Quote?

QUICK ANSWER

After you accept a quote, the installer arranges the network application, installation, metering and electrical inspection. EECA says the process usually takes four weeks or less, although complex installations and inspection delays can take longer.

Accept and Pay the Deposit

EECA says the deposit is usually 10% to 30% of the total, paid after you accept the quote (EECA).

Check If You Need a Building Consent

Since 23 October 2025, roof-mounted arrays under 40 m² per roof, in wind zones up to high, don’t need a building consent. Bigger arrays, or higher wind zones, are exempt if a Chartered Professional Engineer designs or reviews the fixings. The Building Code still applies (building.govt.nz).

Lines Company Approval

Your installer lodges a distributed generation application. For systems under 10 kW, approval typically takes 1 to 2 weeks.

Meter Change

Your meter is set up for two-way metering. Until it is, you can use your solar power but can’t sell any back.

Installation Day

Usually 1 to 2 days: rails and panels go on the roof, the inverter is mounted and connected to your switchboard.

Inspection and Handover

A registered electrical inspector checks the work and issues an Electrical Safety Certificate if it passes. The installer then switches the system on and shows you how it works.

Sources for this section unless stated: EECA.

How to Check a Solar Installer

The installer matters as much as the panels. Check these before you sign.

Licensed electrical work

Electrical work must be done by a licensed electrical worker. Search the public register and ask to see their practising licence (WorkSafe).

Solar experience

Ask how many systems they’ve installed and for a reference from a recent customer (EECA).

Industry membership

EECA points to the SEANZ provider directory for solar companies and Master Electricians for registered electricians.

A site visit

Choose an installer who visits your home to check the roof, switchboard and shading before quoting.

Approved products

Ask whether the panels and inverter meet EECA’s technical specification, or are on its approved solar products list.

End-of-life disposal

Ask what happens to old panels and batteries when they’re replaced or removed. EECA’s checklist suggests planning for e-waste (EECA).

Paying for Solar: Buy, Borrow or Subscribe?

How you pay changes what you’re signing up to.

Pay Upfront

You own the system from day one and keep all the savings. If something goes wrong and the installer won’t fix it, your rights come from the Consumer Guarantees Act, and disputes go to the Disputes Tribunal or the courts (Consumer Protection).

Check: the deposit, when the balance is due and what’s included.

Green Home Loan

EECA says most banks offer home energy loans for solar, and you’ll need a quote before you apply (EECA).

Check: the bank’s requirements for the installer and quote, and the loan terms.

Subscription or Lease

You pay over time and the provider owns the equipment. SolarZero’s liquidation in November 2024 highlighted the risks of long-term solar agreements. Around 15,000 customers were on 20-year leases, and its contract terms raised concerns about restarting the agreement when a system is moved to another home (University of Auckland).

Check: in plain language, what happens if you move, sell or the company fails, and what it costs to exit.

Ready to see what solar would cost for your home?

Tell us about your home and an installer from our network will talk you through your options.

Solar Quote Red Flags

QUICK ANSWER

Be cautious if a quote doesn’t name the equipment, explain the estimated savings or clearly list installation and inspection costs. A missing site assessment or pressure to sign immediately are also reasons to ask more questions.

No site visit

A quote from a satellite image alone can miss roof condition, switchboard limits and shading.

Parts not named

“Premium panels” and “quality inverter” aren’t specifications. Ask for brands and models in writing.

Savings with no workings

If the quote won’t show its self-consumption rate and export price, you can’t check the payback.

Missing costs

Inspections, the meter change, scaffolding and network costs should be in the price or clearly listed as extras.

Pressure to sign

A limited-time discount shouldn’t rush a decision this big. Take time to check the quote.

Vague contract terms

For finance or subscriptions, unclear answers on moving, selling or exit costs are a warning sign.

Frequently Asked Questions

Get a Solar Quote You Can Check

Tell us a little about your home and we’ll connect you with a solar installer from our network to discuss your options.

Free. No obligation.

Sources

Quote My Solar is not a solar installer. We pass your enquiry to one installer from our network, who contacts you about a quote. Read how we work on our Disclosure page.

This information is general in nature and doesn’t take your circumstances into account. Check product details, warranties and contract terms with your installer before you sign.

Spot an error? Email hello@quotemysolar.co.nz.